Cellula Moves into Brand New Facility

Cellula Robotics Ltd. (Cellula) has moved into a brand new, custom-built facility.The new building was constructed by Kask Ventures Corporation and is located at 9000 Bill Fox Way in Burnaby, B.C.

Cellula’s new facility provides 7500 square feet of office space, five loading bays, and a 6800 square foot assembly area with a twenty-four foot ceiling. Integrated in the office areas are dedicated mechanical and control systems laboratories.

To support the development and testing of Cellula’s seafloor drills, a 108 feet deep, eight inch diameter, steel cased hole has been installed in the assembly area. The cased hole will enable drilling with mud, sampling and down hole tool testing of Cellula’s drill systems within the factory environment.

Cellula Robotics Ltd. based in Burnaby, Canada, is a world-leading engineering solutions company that specializes in the turnkey design and production of seafloor intervention and subsea robotic systems. Cellula’s products are primarily used for geotechnical and geophysical applications around the world.